Tuesday, May 13, 2008

Donuts! Mmmmmm!

OK, this is supposed to be a link to get a free sample of Dunkin' Donuts Coffee. (Hopefully it will work. I am a very blog button/link dummy)

Dunkin' Donuts. Dunkin' keeps me blogging. Try Dunkin' Donuts Coffee For Free. Get a Sample

Well, that seems to work. Let me know if it doesn't.

Things are definitely going in the right direction with J. He is back in school (as of last week) and had been a model student. His being able to go to a different classroom to work has completely ended homework, missing assignments, and a lot less headaches all around. We are giving this 5 stars for last week, and on our way to 5 more stars for this week.

J wanted to do band camp this summer, but I just can't swing it. It's from 8:30-11:30 a.m. Now, my question is ... how is a single working mom supposed to be at work at 8 a.m. able to make this happen? Answer: you can't. Even with flex scheduling, there are some things that just are not possible.

I need to send both kids away this summer to camp. I hope I didn't wait too long though. I hope there are still spots open for them. (We'll just add more to the credit card bill. :0) ) They both need some time away from the family, and the family REALLY needs some time away from them.

On the Knitting Side:
I need to get some materials together this week on working Toe-up socks. I forgot that I am supposed to give a small spiel at our guild meeting this Saturday. Crud. Knitty.com, here I come. <>

I am working on a couple of blankets (baby/lapghan sized) to donate still. I am working on a pair of slipper socks, finished the baby hedgehogs (gifted one to Mom for Mother's Day), and am back to working the Mystic Light shawl.

Slow Bee Mystery Shawl started on Mother's Day. I have not cast on yet, but this one looks so pretty, from what I have seen so far.

I also need to get back to the kids vest (donation) that I stopped working (due to lack of enough yarn and a pattern cut off right where I had stopped) . I really want to complete 25 items to be donated to the Warm Woolies group. I have 1 1/2 items done. I think that this is a great use of my wool/mohair Lamb's Pride yarn. We'll just have to see what I can get done.

Back to work time!

Wednesday, May 7, 2008

Life's Getting Better

Well, things have gone a bit better since last time. Not great by any estimate, but better.

J got a 5 day suspension from school for throwing a pencil at his teacher. Not the best at coping with stress/frustration.

We upped his ADHD meds. and this has helped some, but not all that much. He is still very animated, and not too focused. I may suggest that a split dose of his mood stabilizer might be helpful, if it doesn't make him too tired/sleepy.

We are in the countdown mode for the end of the school year. Today is 16 more days to go. Some days this sounds like an overwhelmingly LARGE number. J did get back in school just in time to still be able to participate in his Band concert. He plays the clarinet, and he does it quite well. He hates to practice, but once he gets going, he plays like a champ.

I have to admit that this year's 5th grade band was quite good as well. This can not be said for previous years.

Well, on to knitting. I have stalled out on the 2 lace shawls I am in KAL's for. But that's OK, because I have a 3rd starting this Sunday! LOL. I know, I know, too many projects and not nearly enough time.

Right this instant I have a baby blanket in the works (crocheted), a pair of socks (take along knitting), and the 2 shawls. Oh forgot about the vest I had to stop on while I waited for more yarn.

I just got done knitting 2 hedgehogs (miniaturized), they need to be felted and stuffed. My mom actually requested one of these. I let her pick out the colors from what I had on hand, and I finished it 3 days later. I think I like the mini's better than the full sized ones. They are just too cute. I also knit a pair of socks to donate to WarmWoolies. I also made 2 hats that Jen sent to Afghans for Afghans for me.

I think I will try to finish the Mystic Light shawl first (less left to do). Then finish the other one next. I don't want to start any more until I get these 2 finished. (I have 3 more KAL's that start this Sunday, next month and the following month.)

I like to do some small and simple projects (like the mini hedgehogs) in between the larger projects. It helps to break up the frustration/repetitiveness of some of these projects.

OK, enough rambling for me today. :-) See, I told you it was going a bit better.